Priority and importance: two different questions
Separating urgency from impact is the first step to good prioritization. Priority answers one question: when must this task be done? Importance answers another: how much does this task affect your project? A task can be urgent without being important, or important without being urgent.
The Eisenhower matrix, also called the urgent-important matrix, crosses these two axes. The horizontal axis measures urgency, the vertical axis measures importance. Their intersection forms four quadrants that guide the decision: do, schedule, delegate or drop.
Two scales from 1 to 5
Follo rates priority and importance on five levels, from 1 to 5. Level 1 is the lowest, level 5 is the highest. Here are the exact labels for both scales.
- 1Priority: Very low · Importance: Very low
- 2Priority: Low · Importance: Low
- 3Priority: Medium · Importance: Medium
- 4Priority: High · Importance: High
- 5Priority: Urgent · Importance: Critical
The two scales are independent: a task can be priority 5 and importance 2, or the reverse. This intersection replaces the four quadrants of the Eisenhower matrix.
Where to set priority and importance in Follo
You set these levels directly on every project and every task. A visual selector shows the five levels, with codes P1 to P5 for priority and I1 to I5 for importance.
Code P5 marks an urgent task, code I5 marks a critical one. You assign both ratings in a few seconds, without leaving the item you are editing. These values then sync across all your devices, online or offline.
The dashboard surfaces levels 4 and 5
Tasks at level 4 or 5 stand out immediately on the dashboard. The global dashboard lists critical and urgent tasks so you see them first, ahead of today's tasks and overdue items. Each project dashboard applies the same logic by showing the priority and importance distribution.
Sort your tasks in 4 steps
Here is a four-step method to sort your task list using both scales.
- List your current tasks without sorting them.
- Give each task an importance from 1 to 5, based on its impact on the project.
- Give each task a priority from 1 to 5, based on how urgent it is.
- Sort from the highest level down, then act in that order.
Tasks at priority 5 and importance 5 come first. This order keeps you from confusing what is pressing with what truly matters. Repeat the sort whenever your list changes, so your priorities always reflect the work in front of you.
Frequently asked questions
What is the difference between priority and importance?
Priority measures urgency: when a task must be done. Importance measures impact: how much a task affects your project. A task can be urgent but not important, or important but not urgent. Follo rates these two dimensions separately, from 1 to 5, so you can tell them apart instead of mixing them up.
How do I apply the Eisenhower matrix in Follo?
Give each task a priority and an importance from 1 to 5. The intersection of the two ratings replaces the four quadrants of the matrix. Tasks at priority 5 and importance 5 are the most urgent and critical. The dashboard brings them to the front, so you act on them first.
Which items can I rate for priority and importance?
Every project and every task. A visual selector shows the five levels, with codes P1 to P5 for priority and I1 to I5 for importance. You can change these values at any time, and they sync across all your devices when the network returns.
Why does the dashboard highlight tasks at levels 4 and 5?
Because these are the most urgent and critical tasks. The global dashboard groups them so you spot them first, ahead of today's tasks and overdue items. This focuses your attention on what truly matters, without scanning your entire list.